Schluchseewerk AG

In December 1994, after some time of development, design and construction, a new storage pump was successfully installed and put into operation in the Säckingen underground hydroelectric power plant. A new concept was implemented here, due to the forward-thinking and cooperation of Schluchseewerk AG.

Each old unit consists of a turbine, coupling, motor/generator, hydraulic torque converter and single suction/2-stage storage pump. The oldest of the four pumps had been replaced, with the following requirements:

  • increasing discharge by 20 %
  • reducing cavitation
  • limiting the pump starting power to 38 MW (existing torque converter capacity)
  • installing the pump within the existing constraints: coupling it with the converter as well as with the upstream and downstream spherical valves.

Commissioning and trial operation were concluded in May 1995.